Although we need renewable energy infrastructure to combat climate change, surely there are more appropriate sites where less environmental damage will occur. Reclaimed strip mines, brown fields, and developed areas should be considered for renewable energy projects, not forested mountains that serve as important habitats for species of concern, migratory corridors, and sources of clean water.

Introduction

While renewable energy projects are an important step away from fossil fuel consumption and have great potential to mitigate climate change impacts by reducing carbon, they must be sited properly. In Pennsylvania, the best wind resources are at higher elevations, so wind turbines are most often sited on forested mountains instead of degraded lands. Joseph Kiesecker, Lead Scientist for The Nature Conservancy, points out in his book, “Energy Sprawl Solutions,” that it is possible to balance energy needs and conservation, but we need careful planning, or we could trade one crisis for another: “land-use change and conflict.” His research shows that wind projects should be built on degraded lands, instead of forested mountains, in order to protect critical wildlife and their habitats.

Such is the case for Dunning/Evitt’s Mountain, a forested ridge in Bedford County that contains core forest habitat for several species of conservation need. CPV Kettle Wind, LLC is in the early permitting stages of an industrial wind turbine project proposed for the top of Dunning/Evitt’s Mountain. The turbines would be constructed just south of Rt. 869 and could extend for over 5 miles along the top of the mountain in East St. Clair, South Woodbury, and Bedford Townships. Dunning/Evitt’s Mountain is quite narrow in areas, so a cut and fill construction project would most likely involve:
a. removal of trees on the top of the mountain
b. blasting of bedrock to create rubble
c. bulldozing and compacting the rubble to create a shelf wide enough to support wind turbine pads and roads
d. deep sedimentation ponds below each wind turbine to control stormwater runoff – these ponds would be filled with permeable soil obtained off-site to slow runoff
e. trenches between turbines for electric cables
f. a swath of trees removed down the mountain so an above-ground transmission line can be run from on top of the mountain to the substation along Black Bear Lane
...continue reading "Environmental Concerns and Potential Impacts of a Proposed Wind Project on Dunning/Evitt’s Mountain in Bedford County"